
Northwestern Lake Forest Hospital – IL Route 43 Right-In/Right-Out
Northwestern Lake Forest Hospital tasked Bleck Engineering with the design, permitting, and construction administration services for a new right-in / right-out access point on North Bound Waukegan Road in anticipation of the construction of a new replacement hospital on campus. Several locations for this access point just south of a traffic light were studied until a good balance was struck to minimize truck traffic impact on the neighboring residential subdivision to the south while preserving an existing mature oak grove to north and maintaining an ideal distance from the signalized intersection.
Client
- Northwestern Medicine & Northwestern Memorial Healthcare
- HGA
- Turner Construction Company
- DK Contractors
Permitting
- US Army Corps of Engineers
- Lake County Stormwater Management Commission
- Illinois Department of Transportation
- Illinois Environmental Protection Agency
- City of Lake Forest
- McHenry County Soil & Water Conservation District
Project Scope
- Drainage Study & Stormwater Management
- Civil Engineering – Construction Documents
- Site Grading
- Site Utilities
- Roadways and Parking
- Highway Improvements
- Best Management Practices
- Permitting
- Construction Engineering / Administration
- Construction Layout
Project Gallery



Project Location
1000 N Westmoreland Road, Lake Forest, IL